The PA was a placeholder: 9 painted stripes and 4 lights on a slab.
Rebuilt it against sourced figures rather than recollection.
Sources:
* OpenStreetMap way 59608205 (大黒ふ頭パーキングエリア) -- the apron is
181 m x 174 m / 1.6 ha, i.e. essentially SQUARE, not circular.
* ja.wikipedia 大黒パーキングエリア -- 首都高速で最大のPA, opened
1989-09-27. Capacity 小型 341 + 大型 59 + 身障者用 4 = 404, now
reproduced EXACTLY (11 rows x 31, 20/20/19, 1 row x 4).
* 本館 on the west side, ベイサイドテラス二番館 on the north, per the
same article. EV rapid charger (first on a Japanese expressway,
2008-10-10) and the 段差 bumps retrofitted to deter lowered cars.
Stall dimensions (小型 2.5x5.0 m, 大型 3.3x12 m, 6 m aisles) are
conventional JP parking-design values and are commented as NOT
primary-sourced, unlike the 全標協 road markings. Building footprints
are art-directed to the aerial and flagged as such.
tools/verify_daikoku_pa.luau asserts capacity, containment, block
separation and building placement in-engine: 20 passed, 0 failed.
Two bugs found and fixed by that harness:
* The hand-placed 小型 Z origin overlapped the 大型 bays by 42 studs.
The origin is now DERIVED from the 二番館 frontage; clearance is
61.4 studs. The first version of the overlap test compared
consecutive head lines (always 0 for back-to-back rows), which was
meaningless and hid this.
* push_mapbuilder.py lost a byte whenever a chunk began with a
newline -- Lua long-bracket literals swallow a newline directly
after the opening bracket (assembled=65158 vs 65159). It now emits
a deliberate leading newline; the push verifies match=true.