Daikoku PA: lift mainline over the apron, rebuild both ramps

The PA ring road and the expressway mainline were both at ground level, so
the ring parapet stood INSIDE the carriageway (measured -10.0 studs of
vertical overlap: a wall in the middle of the road).

Reference photos of the real Daikoku Futo PA show the expressway flying
OVER the parking apron on pillars, with the PA at ground level and ramps
climbing up to meet it. Rebuilt to match:

- mainline lifted 38 studs through the junction, eased in/out (max 5.26%
  grade, within real expressway limits)
- PA ring + apron stay at ground level; legacy PARingPillar props removed
- both on/off ramps regraded over the full rise with smoothstep easing,
  segments overlapped 3 studs so wheels can't catch a seam, plus support
  pillars and edge kerbs where the deck is high

Verified in-engine against built parts (tools/diag_daikoku.luau), not just
source: clearance now +28.0 studs, both ramps continuous (max step 5.62,
no gaps). tools/plot_daikoku.py renders the plan/section for comparison.
This commit is contained in:
2026-08-02 15:56:13 -04:00
parent 8808b919c3
commit c8dabea53a
51 changed files with 6558 additions and 65 deletions
Binary file not shown.

After

Width:  |  Height:  |  Size: 151 KiB